midnight thunderbox

loo install - part one

16 may 2010 – phil and I spent a couple of days constructing the ‘rota-loo’ composting toilet building, set in the forest about 50 metres away from the hut site…

loo install - part one

we set and levelled four sandstone footings to elevate the steel frame from the forest floor…

loo install - part one

then spent a lot of time and effort man-handling the heavy steel frame into position…

composting loo install - midnight thunderbox

composting loo install - midnight thunderbox

next, we fixed the variously sized pre-cut plywood panels into the frame, in preparation for installation of the loo components…

composting loo install - midnight thunderbox

this image shows the drum in place under the floor platform…

composting loo install - midnight thunderbox

after two days work, the building is almost complete – dubbed “alan, the midnight thunderbox” (alan, in reference to the hilarious black-blob anarchist from modern toss – a ‘little shit’ if ever there was one!)…

we’ll be returning to add the vent pipes, the guttering and rainwater tank, and shelving…

composting loo install - midnight thunderbox