preparing the footings

22 may 2010 – up at katoomba again, this time working flat surfaces into our sandstone footings. The steel frame of the hut will be fixed to these planes, elevating the entire structure about 500mm from the ground…

preparing the footings

preparing the footings

preparing the footings

preparing the footings

I used a small hand-held grinder to cut slots in the stone, where it needed to be removed. Then a ‘ten pound’ hammer and cold chisel to slowly carve away the stone and form a level surface. The final stage was using a small plate of steel to grind away the slight imperfections…

preparing the footings

one of the corner blocks, close to completion… phil will deliver the blocks to site for the next stage of work – situating and levelling the blocks in preparation for installation of the steel floor frame and plywood flooring…